Proven Methodology

The LFB Master Journey

A systematic four-phase approach that transforms your vision into an optimized, lean factory — built for performance and ready for the future.

4
Strategic Phases
100%
Transparency
3-12
Months Typical
01
Pulse Check
1-2 weeks
02
Diagnosis
2-4 weeks
03
Layout Design
3-6 weeks
04
Execution
Variable

Your Journey to Excellence

Each phase builds on the previous, ensuring a systematic transformation from concept to commissioning

Phase 1
Engagement & Pulse Check
1-2 weeks
Phase 2
Lean Diagnosis
2-4 weeks
Phase 3
Layout Development
3-6 weeks
Phase 4
Project Execution
Variable

Our Commitment: No Surprises

Complete transparency at every step. Each phase has clear deliverables, timelines, and sign-offs. You'll always know what to expect, what we're working on, and what comes next.

01

Engagement & The "Pulse Check"

Understanding your needs and confirming mutual fit through our complimentary consultation

What is a Pulse Check?

A complimentary consultation visit where we explore your facility and understand your unique challenges.

  • Tour your existing or proposed facility
  • Understand your products and processes
  • Learn about your challenges and goals
  • Identify preliminary opportunities
Duration: 2-4 hours • Complimentary

Techno-Commercial Proposal

Following the Pulse Check, we submit a detailed proposal tailored to your specific needs.

  • Scope of work and deliverables
  • Phased approach and timeline
  • Investment and payment terms
  • Success criteria and metrics

Ready to Get Started?

The Pulse Check is complimentary and risk-free — explore how we can help.

Request Pulse Check
02

Lean Diagnosis & Opportunity Identification

Building the factual foundation for all LFB layout and building decisions

1

Data Collection

Product portfolio, process flows, equipment specs, volumes, and constraints.

2

Process Mapping

Material and information flows across all product families and stages.

3

Spaghetti Analysis

Visual waste identification through mapping flow paths and operator movement.

4

Shop-Floor Study

Time studies, bottleneck identification, and ergonomics evaluation.

5

Waste Quantification

Measuring and categorizing the seven types of waste.

6

Documentation

As-is layout, value stream mapping, and improvement potential.

Deliverable: Comprehensive Diagnostic Report

A detailed report documenting current state, identifying opportunities, and quantifying improvement potential — the foundation for Phase 3 design work.

03

Lean Layout Development (2D CAD)

Designing your optimized future state where flow leads and the building follows

The Design Process

Iterative refinement using LFB principles so that flow leads and the building follows.

  • Multiple layout alternatives based on lean principles
  • Assessment against flow, space, flexibility, and cost
  • Detailed development and stakeholder validation
  • Final 2D CAD layout with dimensions

Key Design Principles

Every layout incorporates proven lean manufacturing principles.

  • Continuous flow with minimal transportation
  • Visual management and ergonomic design
  • Flexible configuration for volume variation
  • Future expansion capability built-in

For Greenfield

Production footprint, support sizing, building dimensions, column grid, loading docks

For Brownfield

Equipment relocations, new positions, aisle widths, storage locations, utility requirements

Deliverables

2D CAD layouts, equipment list, area calculations, flow diagrams, implementation notes

04

Project Execution

Bringing the design to life with complete execution support

Greenfield Execution

For new factory construction:

  • Complete architectural design
  • Structural & MEP engineering
  • 3D visualization & walkthroughs
  • Statutory approvals & compliance
  • Construction supervision
Learn More

Brownfield Execution

For existing factory optimization:

  • Workstation & work cell design
  • Material handling systems
  • Implementation planning
  • Installation supervision
  • Training & standardization
Learn More

Post-Commissioning Support

Ensuring your LFB-designed factory performs as intended in daily operations

Factory Shifting

Assistance during the critical transition from old to new facility or layout.

Visual Factory

Deployment of visual management systems for self-explaining operations.

Production Planning

Guidance on establishing effective production planning and control systems.

Supply Chain

Optimization of supply chain to align with your new operational flow.

Learn About Post-Commissioning

Timeline & Investment

Understanding the journey ahead

Project Timeline

Phase 1 1-2 weeks
Phase 2 2-4 weeks
Phase 3 3-6 weeks
Phase 4 Variable
Total 3-12 months

Timelines align with your shutdown windows, commissioning milestones, and business constraints.

Investment Structure

  • Phase 1: Complimentary Pulse Check
  • Phase 2-3: Fixed fee for diagnosis & layout
  • Phase 4: Scope-specific execution fees
  • Payment: Milestone-based installments

Request a Pulse Check to receive a customized proposal.

Start Your Journey to an Optimized Factory

Begin with a complimentary LFB Pulse Check. We'll assess your facility and show you the step-by-step process to transform your operations.