Greenfield Projects

Greenfield Factory Design with LFB

Design your process and flow first, then create a building that supports peak efficiency from day one

Flow First
Process Before Structure
Decades
Of Locked-In Efficiency
6 Steps
Complete Process
Flow-First Layout Process defines structure
Future-Ready Expansion built-in
6S Embedded Lean from day one

Design Your Ideal Factory from Day One

Flow‑first layouts aligned to value streams

Integrated architecture, structure, and MEP designed around Lean principles

Future‑ready designs prepared for expansion and automation

Discuss My Greenfield Project

Why Greenfield Projects Need LFB

A new factory is a once‑in‑decades decision with irreversible consequences. It is the single best opportunity to build efficiency into your DNA. LFB ensures your plot usage, building orientation, grids, and utilities are driven by flow and Lean logic, not by standard architectural templates.

The Greenfield Advantage

A new factory is a blank canvas and your once-in-a-lifetime opportunity. With no existing constraints, we can design the perfect production flow first, then wrap the ideal building around it.

  • Avoid layouts that lock in high material handling and energy costs for the life of the plant
  • Keep future lines and expansions structurally feasible without demolition
  • Align land use, docking, and circulation with actual product and logistics flows
  • Embed 6S and safety standards into the physical design from day one

The Stakes Are High

Every decision you make now will impact operations for decades. Poor early decisions become permanent constraints that:

  • Force inefficient material flows that waste time and money daily
  • Require expensive material handling systems to compensate for layout problems
  • Block future automation and expansion opportunities
  • Create safety and quality issues that are structurally embedded

LFB gets it right from the beginning, preventing these locked-in inefficiencies.

Our Greenfield Process

A systematic approach that places flow before form

1

Process & Flow Analysis

Understand product families, volumes, and value streams to define the ideal flow before drawing lines.

2

Lean Layout Options

Develop multiple layout options that minimize movement, waiting, and congestion.

3

Architecture Around Flow

Define building envelope, grids, heights, and entries specifically around the chosen Lean layout.

4

Integrated Engineering

Structure and MEP systems designed to support flow, safety, and energy efficiency.

5

Compliance & Approvals

Ensure plans meet all statutory and industrial regulations seamlessly.

6

Visualization & Support

Use 3D walkthroughs to align stakeholders and provide on-site checks to ensure the built factory matches the Lean intent.

Core Architectural & Engineering Services

You get a single partner for concept, design, approvals, and supervision—so responsibilities are clear

Architectural Drawings

Complete design documentation with:

  • Column grids, spans, and levels coordinated with equipment and flow
  • Site plans and plot layouts
  • Floor plans (all levels)
  • Elevations and sections
  • Door, window, and finish schedules

Structural Design

Engineering for strength and flexibility:

  • Structure designed to support cranes, mezzanines, and future lines without rework
  • Foundation design for equipment loads
  • Column and beam optimization
  • Roof structure and load calculations
  • Expansion provisions

MEP Engineering

Utilities that enable operations:

  • Utilities routed to support flow and flexibility, not just shortest pipe run
  • Electrical distribution and lighting
  • Plumbing and drainage systems
  • HVAC design and zoning
  • Fire protection systems

Specialized Compliance & Planning

Navigating regulatory requirements and approvals

Statutory Approvals

We prepare and deliver complete drawing packages for all required approvals:

  • Municipal building permissions
  • Industrial area approvals
  • Environmental clearances
  • Fire NOC documentation
  • Occupancy certificates

Factory Act Compliance

Ensuring your facility meets all industrial regulations:

  • Factory Act requirements
  • Safety and welfare provisions
  • Sanitation standards
  • Worker amenity spaces
  • Emergency egress planning

Vastu Shastra Integration

For clients who value Vastu principles:

  • Building orientation per Vastu
  • Zone allocation (North, East, etc.)
  • Entry and exit placement
  • Balance with functional requirements

BCP Development

Building Construction Plan for civil contractors:

  • Construction methodology
  • Material specifications
  • Quality control measures
  • Architect inspection levels

Visualization & Interior Design

Bringing your factory to life before construction begins

3D Visualization

High-quality 3D renderings and walkthroughs that help you:

  • Visualize the completed facility
  • Communicate vision to stakeholders
  • Identify design issues early
  • Make confident decisions
  • Present to investors and partners

Interior Design

Professional design for non-production areas:

  • Office and administrative spaces
  • Conference and meeting rooms
  • Cafeteria and break areas
  • Reception and visitor areas
  • Landscaping and external aesthetics

6S Concepts Embedded in Design

Building lean principles into the physical structure

Sort & Set in Order

Line‑side stocking, supermarkets, and staging areas defined clearly in the layout. Every item has a designated home built into the design.

Shine & Standardize

Clear access for cleaning, concealed but maintainable services, and uniform light levels. Easy-to-clean surfaces and standardized design throughout.

Sustain & Safety

Visual lanes, markings, and ergonomics planned in drawings—not added later with paint. Safety features and good practices become structurally easier to maintain.

Construction Supervision

Supervision ensures that the final built factory preserves the clearances, adjacencies, and lines of flow agreed in the LFB design

Design Intent Protection

  • Regular site visits and inspections
  • Verification of critical dimensions and clearances
  • Flow path preservation during construction
  • Coordination with contractors
  • RFI responses and technical clarifications

Quality Assurance

  • Construction quality verification
  • Compliance with LFB design intent
  • Material and workmanship checks
  • Punch list management
  • Handover support and documentation

Our supervision ensures the built factory performs exactly as designed, with no compromises to the flow logic that drives operational efficiency.

Ready to Build Your Ideal Factory?

Start with a complimentary LFB Pulse Check for your greenfield project. Design the process first, then the building—optimize flow, layout, and expansion before locking your design.